We are using GP 2016, bill of materials, no modifications, no third parties. We are process manufacturing food.
I want to be able to release an assembly entry to make a quantity of 200. Once the process is complete however there is often less than 200 produced do to spoilage in the production process. The spoilage is not a constant or even predictable. To avoid having to rekey the stock quantity on each assembly is there a way I can maintain the quantity of raw materials (stock quantity) used as we change the assemble quantity to reflect what was actually produced?